The most common of the RoadTrain® package plants is for a fully welded rectangular tank design. This design allows for a very high level of offsite fabrication, assembly and works testing.
Typically sized for 50 – 1200EP, multiple RoadTrain® units can be used to accommodate population growth and/or changes in discharge requirements.
To view Hydroflux Epco’s full range of package Sewage Treatment Plant Options please select from the links below:
- • Rectangular Bolted Package Sewage Plants – For remote locations that are very difficult to reach, or access to large cranes is not possible
- • Circular Package Sewage Plants – For larger packaged systems, typically 2000 EP or greater
- • Package Sewage Plant Sludge Management – Sludge wasting and management is a critical process step in any wastewater treatment plant
As a pioneer in Australia, Hydroflux Epco continues to offer EPCO Australia’s complete design, build, install and refurbishment service. Our commitment to our clients does not end with the delivery of the project and we support our clients so that that their plants continue to operate at their full design capacity well into the future.