For remote locations that are very difficult to reach, or access to large cranes is not possible, RoadTrain® package plants can be delivered as bolted systems. The steel tanks are delivered flat packed and then bolted onsite.
Hydroflux Epco has supplied numerous bolted RoadTrain® systems to mine sites and towns in very remote locations. The assembly is typically carried out by local site crews with supervision of installation by Hydroflux Epco.
To view Hydroflux Epco’s full range of package Sewage Treatment Plant Options please select from the links below:
- • Rectangular Welded Package Sewage Plants – The most common of the RoadTrain® package plants is for a fully welded rectangular tank design
- • Circular Package Sewage Plants – For larger packaged systems, typically 2000 EP or greater
- • Package Sewage Plant Sludge Management – Sludge wasting and management is a critical process step in any wastewater treatment plant
As a pioneer in Australia, Hydroflux Epco continues to offer EPCO Australia’s complete design, build, install and refurbishment service. Our commitment to our clients does not end with the delivery of the project and we support our clients so that that their plants continue to operate at their full design capacity well into the future.